Subassembly production outsourced: When is a system partner worth it?

9th July 2026

Pro­cu­ring indi­vi­du­al parts or assig­ning a com­ple­te func­tion?

Anyo­ne who wants to out­sour­ce their com­po­nent manu­fac­tu­ring should not only compa­re part pri­ces, but also the enti­re effort up to the tes­ted com­po­nent. KOMOS GmbH from Bür­gel (Thu­rin­gia) ful­ly hand­les elec­tro­me­cha­ni­cal func­tion­al com­pon­ents – from its own parts manu­fac­tu­ring to test­ing, in series sizes of 100 to 50,000 units.

Many tech­ni­cal pro­ducts con­sist of num­e­rous indi­vi­du­al com­pon­ents that only work tog­e­ther to ful­fill a spe­ci­fic func­tion. Metal com­pon­ents, pla­s­tic parts, elec­tri­cal cont­acts, cables, and sen­sors must work relia­bly tog­e­ther.

The­r­e­fo­re, a fun­da­men­tal ques­ti­on ari­ses for manu­fac­tu­r­ers: Is it more eco­no­mic­al to pro­cu­re all com­pon­ents indi­vi­du­al­ly and assem­ble them them­sel­ves, or to assign the enti­re func­tion­al assem­bly to a spe­cia­li­zed part­ner? The ans­wer does not depend sole­ly on the part pri­ce.

The cos­ts often ari­se at the inter­faces.

Anyo­ne who coor­di­na­tes seve­ral sup­pli­ers for a com­po­nent must coor­di­na­te dif­fe­rent deli­very times, qua­li­ty requi­re­ments, and tech­ni­cal chan­ges with each other. In addi­ti­on, the­re are also inco­ming goods, warehousing, assem­bly, and test­ing pro­ces­ses.

The more inter­faces invol­ved, the hig­her the orga­niza­tio­nal effort beco­mes. Our com­ple­xi­ty cost cal­cu­la­tor shows you how high this effort is for your build group. (Save pro­duc­tion cos­ts – KOMOS) in a few minu­tes.

The com­ple­te assign­ment of a func­tion­al assem­bly group can signi­fi­cant­ly redu­ce this com­ple­xi­ty. What is cru­cial is that the manu­fac­tu­ring part­ner not only sup­pli­es indi­vi­du­al com­pon­ents, but also takes over the enti­re agreed func­tion up to the tes­ted assem­bly group.

What KOMOS stands for as a com­po­nent part­ner

KOMOS GmbH is a fami­ly-run com­pa­ny foun­ded in 1991 with around 70 employees and cer­ti­fi­ca­ti­ons accor­ding to ISO 9001, ISO 13485 and VDE. At its loca­ti­on in Bür­gel, it com­bi­nes seve­ral manu­fac­tu­ring tech­no­lo­gies:

  • Stam­ping and sha­ping
  • CNC tur­ning
  • Pla­s­tic injec­tion mol­ding
  • Cont­ac­ting and con­nec­tion tech­no­lo­gy
  • Assem­bly as well as elec­tri­cal and func­tion­al test­ing

This allows metal and pla­s­tic com­pon­ents to be com­bi­ned into com­ple­te elec­tro­me­cha­ni­cal func­tion­al assem­blies.

KOMOS sup­ports pro­jects from tech­ni­cal coor­di­na­ti­on through indus­tria­liza­ti­on to mass pro­duc­tion. The typi­cal seri­al pro­duc­tion volu­me is bet­ween 100 and 50,000 units, depen­ding on the com­po­nent and manu­fac­tu­ring pro­cess.

When is the total award wort­hwhile?

A glo­bal assign­ment is par­ti­cu­lar­ly inte­res­t­ing when seve­ral manu­fac­tu­ring pro­ces­ses come tog­e­ther, an elec­tri­cal or mecha­ni­cal func­tion needs to be tes­ted, or the coor­di­na­ti­on effort requi­red so far is high. Cen­tra­li­zed cont­act points can also pro­vi­de bene­fits in the event of fre­quent pro­duct chan­ges.

The decisi­ve cri­ter­ion when out­sour­cing your com­po­nent manu­fac­tu­ring is the­r­e­fo­re not only the purcha­se pri­ce, but also the total cost up to the time when the rea­dy-to-use, tes­ted com­po­nent is deli­ver­ed. This also appli­es when a pro­duc­tion from abroad is to be retrie­ved.

Check­list for sup­pli­er sel­ec­tion

  • Which func­tion should the part­ner be ful­ly respon­si­ble for – and whe­re does it end?
  • Which pro­ce­du­res does he per­form hims­elf, and which ones does he purcha­se?
  • What tests does he per­form on the finis­hed assem­bly and docu­ments them?
  • How do tech­ni­cal chan­ges work, and who is respon­si­ble for appro­ving them?
  • Does it fit your quan­ti­ty requi­re­ment?
  • How quick­ly can you reach a respon­si­ble per­son in case of a pro­blem?

Do you want to out­sour­ce your com­po­nent manu­fac­tu­ring?

KOMOS will work with you to deter­mi­ne which manu­fac­tu­ring, assem­bly, and test­ing steps can be taken over.

Six-fold socket out­let with metal hol­der and con­nec­ting cable – elec­tro­me­cha­ni­cal func­tion­al assem­bly made of metal, pla­s­tic, cont­acts and cable from KOMOS